Recent Projects

  • Beheira Governorate was suffering from a shortage of produced water which is estimated 750.000 m3/day “treatment water plants and artesian wells”.
  • And also, there were some deprived villages as well as villages served by alternative systems with other villages for several hours.
  • BWADC made a lot of efforts to connect service to all districts, villages, “Ezba” and subsidiaries areas, according to the electoral program of Mr. President of A.R.E.
  • The Housing Ministry had developed an urgent plan to provide potable water to all citizens with suitable pressure and finishing the implementing of this plan before summer 2008.
  • As the Housing Ministry and HCWW, in cooperation with the Beheira Governorate had provided the needed funds for constructing 15 treatment water plants with total capacity (25.000m3/d & 50.000m3/d) and establishing 14 artesian wells with total cost estimated 750 million pound.
  • After the implementing of projects included in this urgent plan, the production capacity is increased by 600.000 m3/d” with increment ratio estimated by 75% of total capacity”
  • The per capita average after implementing of urgent plan becomes 250 l/p/d instead of 100 l/p/d.

Urgent plan consists of:

  • 16 water treatment plants with production capacity “300 – 400 – 600 l/s”.
  • 14 artesian wells.

To implement the Urgent Plan as soon as possible, BWADC has formed technical working groups to perform the following tasks:

Study the current situation: Determine sites of construction , regulate properties and perform total station activities.
Execution by BWADC: for some works (networks – intakes – electrical and mechanical works as well as sign contracts with qualified contractors to implement the civil works)
General Supervision: of projects that implemented by consultant, with taking into consideration conforming the technical studies to the objectives of the Master Plan.

First: BWADC had constructed 16 plants with various discharges (25.000 – 34.000 – 50.000 m3/day):

 Geddia Water Treatment Plant:

Location: Geddia – Rashid. Design Capacity: 25000 m3/d
Served Population: 200.000
Served Area: Rashid town and district

 Meniat El Saeed Water Treatment Plant :

Location: Meniat El Saeed – Al Mahmoudiya.
Design Capacity: 25000 m3/d Served Population: 200.000
Served Area: Al Mahmoudiya town and district in addition to some rural areas in Idco

Abatok Water Treatment Plant:

Location: Abatok – Shabrakhit.
Design Capacity: 25000 m3/d Served Population: 400.000
Served Area: Rural areas of Shabrakhit and some rural areas in Itay Al Baroud

East of Itay Al Baroud Water Treatment Plant:

Location: East area of Itay Al Baroud
Design Capacity: 25.000 m3/d Served Population: 250.000
Served Area: Rural areas in East of Itay (town and district)

Fesha Water Treatment Plant:

Location: Fesha – Al Mahmoudiya.
Design Capacity: 25.000 m3/d Served Population: 300.000
Served Area Rural areas of Al Mahmoudiya, Al Rahmaniya and some rural areas in Damanhour.

Qazaz Laboratory Treatment Plant :

Location: Qazaz Laboratory – Kafr Al Dawar.
Design Capacity: 25.000 m3/d Served Population: 300.000
Served Area: Rural areas of Kafr Al Dawar

Kom El kanater Water Treatment Plant:

Location: Kom El kanater – Abo Hommos.
Design Capacity: 25.000 m3/d Served Population: 400.000
Served Area: Rural areas of Abo Hommos and some rural areas in Hosh Essa

Dinshal Water Treatment Plant:

Location: Dinshal.
Design Capacity: 34.000 m3/d Served Population: 450.000
Served Area: Rural areas of Damanhour and some villages in Itay and Delingat.

Manshiet Nassar Water Treatment Plant:

Location: Manshiet Nasar – Kafr Al Dawar .
Design Capacity: 50.000 m3/d Served Population: 400.000
Served Area: Rural areas of Damanhour district

Abo Almatamer Water Treatment Plant :

Location: Abo Al Matamer.
Design Capacity: 50.000 m3/d Served Population: 400.000
Served Area: Abo Al Matamer town and district

Abis Water Treatment Plant:

Location: Abis – Kafr Al Dawar .
Design Capacity: 34.000 m3/d Served Population: 500.000
Served Area: Rural areas of Kafr Al Dawar

Kafr El Dawar Water Treatment Plant:

Location: Kafr El Dawar.
Design Capacity: 50.000 m3/d Served Population: 500.000
Served Area: Rural areas of Kafr El Dawar district

Kom Hamada Water Treatment Plant :

Location: Kom Hamada.
Design Capacity: 50.000 m3/d Served Population: 400.000
Served Area: Kom Hamada

Al Bostan Water Treatment Plant:

Location: Delingat.
Design Capacity: 50.000 m3/d Served Population: 400.000
Served Area: Delingat Town and district

West of Itay El Baroud Water Treatment Plant:

Location: West of Itay El Baroud.
Design Capacity: 34.000 m3/d Served Population: 300.000
Served Area : Rural areas in West of Itay

Second: BWADC had established 14 Artesian wells in some villages of the south of Beheira:

City/district Location Wells No. Designed Capacity (l/s)
1 Itay El Baroud West of Tawfikia 1 25
2 Itay El Baroud East of Tawfikia 1 25
3 Kom Hamada Bibian 1 25
4 Wadi El Natrun Al Safa w Al Marwa 1 25
5 Wadi El Natrun Al Isra and Al Mi’raj 1 25
6 Wadi El Natrun Salah El Abd 1 25
7 Wadi El Natrun

Abd el Azim Zaher

1 25
8 Wadi El Natrun Al hamra 2 25
9 Delingat City of Delingat 2 25
10 Delingat Al Khoraimat 3 25

Third: Water Networks.

Before the implementing of urgent plan, the total length of distribution networks reached 850.000 km with various diameters. After the implementing of urgent plan, the total length of distribution networks reached 970.000 km with various diameters. The projects, included in urgent plan had being implemented by BWADC that lead to save about 150.000.000 pounds.